
RULES
|
||
|
Issued |
Effective |
Item |
|
Port
equipment shall be rented under the following conditions and charges |
||
|
1. |
Port equipment is presumed to be in good operating condition when turned
over to user, but the |
|
|
2. |
Port equipment turned over to user is under user's supervision, direction
and control. User assumes sole responsibility and liability for injury to or
death of any person whomever, or damage to or destruction of property,
including employees and property of the |
|
|
3. |
Users shall not use or operate equipment so as to exceed the maximum rated capacity. |
|
|
4. |
Except as may be provided by any agreement, normal repair and maintenance of
equipment shall be performed by the |
|
|
5. |
A user shall be responsible for any and all damage to or destruction of equipment, and for all repairs required to be made other than for normal repair and maintenance. "Normal repair and maintenance" is defined to mean all repair and maintenance deemed to be necessary by the Port Director, except such repair as may be required in the event of damage to or destruction of the equipment, in whole or in part, incidental to, arising out of, or caused by, directly or indirectly, user's possession, use or operation of said equipment, whether by user, its officers, agents, or employees, or by any person or persons acting with the knowledge and express or implied consent of user. The Port Director reserves the right to stop the operation of any equipment at any time if it does not appear to be in proper operating condition and to make necessary repairs. |
|
|
6. |
Neither the Port, nor any of its officers or employees, shall be responsible for delays attributable to any cause, event or occurrence of whatever nature to vessels, land transportation equipment, or cargo, or for any expenses, costs, or damages incurred by user or any other person which arises out of the use of anticipated use of equipment. |
|
|
7. |
User subject to insurance provisions of the |
|
|
8. |
Unless otherwise arranged, orders for rental of equipment shall be honored in the order in which they are received, provided that use of equipment in direct loading or discharge of vessels shall take precedence over intra terminal use, and intra terminal work shall take precedence over use extending beyond the terminal limits. |
|
|
9. |
The provisions in this sub-rule are subject to sub-rule |
|
EQUIPMENT RENTAL CHARGES (SUBJECT TO ITEM 885) |
||
|
Issued: |
Effective: |
Item |
|
LIFT TRUCKS* |
||
|
Rated Capacity Not Exceeding |
Rate Per Hour |
Minimum Charge |
|
7,000 Lbs. ( 3-1/2 Tons) |
$49.44 |
$49.44 |
|
15,000 Lbs. ( 7-1/2 Tons) |
$98.88 |
$98.88 |
|
20,000 Lbs. (10 Tons) |
$111.78 |
$111.78 |
|
50,000 Lbs. (25 Tons) |
$179.49 |
$179.49 |
|
60,000 Lbs. (30 Tons) |
$227.85 |
$227.85 |
|
MISCELLANEOUS EQUIPMENT |
||
|
D-7 Caterpillar |
$159.06 |
$159.06 |
|
Mechanical Sweeper |
$111.78 |
$111.78 |
|
Port Truck & Trailer (20 ton maximum) |
$111.78 |
$111.78 |
|
Front End Loaders - 1-1/2 Yards & Less |
$81.68 |
$81.68 |
|
Front End Loaders - 3-1/2 Yards & Less |
$111.78 |
$111.78 |
|
Front End Loaders - 5 Yards & Less |
$209.57 |
$209.57 |
|
Trackmobile |
$146.17 |
$146.17 |
|
Multi-Purpose Bridge Crane |
$902.81 |
$3611.21 |
|
Water Truck |
$55.89 |
$55.89 |
|
Boats, viz. |
||
|
"Sunrise" |
$207.43 |
$829.72 |
|
Work Boat |
$98.88 |
$395.51 |
|
Harbor Patrol Boat |
$197.76 |
$791.03 |
|
Liebherr Mobile Harbor Cranes: Utilizing the Container on Barge Service, between the Port of Stockton and the Port of Oakland unmanned and dry. |
$250.00 |
$1,000.00 |
|
Liebherr Mobile Harbor Cranes: Not associated with the Container on Barge Service, unmanned and dry |
$850.00 |
$3,400.00 |
|
Mobilization of Liebherr Mobile Harbor Cranes charges subject to quote upon request. |
|
|
|
*Rates do not
include operators. The |
||
|
Port of Stockton |
Port Director Richard Aschieris |
|
Accounts Manager |
|
Deputy Port Director Mark Tollini |
|||