|
Port of Stockton
Projects
As of January 6, 2012
|
Request
for Qualifications
|
|
|
|
|
|
|
|
|
|
Project Name |
Contract Number
|
Cost for
Documents / Drawings
|
Bid Date
|
Pre-Bid Conference
|
| |
|
|
|
|
Professional
Consulting Services (pdf)
Attachment 2, Federal Requirements
(revised) (pdf)
Attachment 3, Current and Planned Project List
(pdf)
|
08-11-1 |
N/A |
January
18, 2012 |
N/A |
| |
|
|
|
|
| |
|
Out for Bid
|
|
|
|
|
|
|
|
|
|
Project
Name:
|
Contract Number
|
Cost for
Documents / Drawings
|
Bid Date
|
License
Requirements
|
Project
Estimate
|
Pre-Bid Conference
|
| |
|
|
|
|
|
|
Secure Systems Software Project "S3" (pdf)
Request
for Proposals (pdf)
Addendum No 1 (pdf)
Addendum No 2 (pdf)
|
12-11-2 |
N/A |
February 1, 2012
3:00 pm |
Certifications for products |
N/A |
|
| |
|
|
|
|
|
|
West Complex Railroad Track Extension 1, 2
(pdf)
Documents
available online for download:
1.
Project Manual Documents 00010 thru 00800 Attachment II
(6 MB pdf)
2.
Project Manual Documents 00821 thru 01770
(3 MB pdf)
3.
Exhibit A - Site Location (126
KB pdf)
4.
Exhibit B - Drawings
(2 MB pdf)
5.
Exhibit C - Tech. Specs for Construction of Industrial Tracks
(2 MB pdf)
Bid Walk Attendees (pdf)
Addenda
No. 1
(pdf)
Top 3 Apparent Low Bidders (pdf)
|
12-11-1 |
$0.00 |
January
11, 2012 |
Calif. "A"
Contractor's Lic. |
N/A |
Mandatory
Dec. 21, 2011
2:00pm |
| |
|
|
|
|
|
|
West Complex Dock #14 Improvements 1, 2
(pdf)
Pre -Bid Conference Attendees (pdf)
Addendum No. 1
(pdf)
Addendum No. 2 (pdf)
Top 3 Apparent Low Bidders (pdf)
| 11-11-2 |
$50.00 |
January
12, 2012 |
Calif. "A"
Contractor's Lic. |
N/A |
Mandatory
Dec. 21, 2011
10:00am |
| |
|
|
|
|
|
|
West Complex Berth 14 Dock Fender Improvement 1, 2
(pdf)
Project Manual (pdf) (9Mb)
Bid Walk Attendees (pdf)
Addenda 1 (pdf)
Addenda 2 (pdf)
Addenda 3 (pdf)
|
01-12-1 |
$0.00 |
February 8, 2012 |
Calif. "A"
Contractor's Lic. |
N/A |
Mandatory
Jan. 25, 2012
10:00am |
| |
|
|
|
|
|
|
Port of Stockton Marine Highway Barge Modification Project 1, 2
(pdf)
Project Manual (pdf)
|
01-12-2 |
$0.00 |
February 29, 2012 |
Calif. "A"
Contractor's Lic. |
N/A |
Mandatory
Feb. 13, 2012
Brusco Tug & Barge Maintenance Yard, 1 Tugboat Alley, Cathlamet, WA 10:00am |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
In Progress
|
|
|
|
|
Contract Number
|
Bid Open
|
NTP
|
Completion Date
|
|
|
Container
Crane Demolition |
10-10-1 |
June 1, 2011 |
September
6, 2011 |
October 20,
2011 |
|
|
|
|
|
|
|
|
|
Boiler
Room Demolition |
01-11-1 |
June 2, 2011 |
August 8,
2011 |
September
21, 2011 |
|
|
|
|
|
|
|
|
|
BNSF/Port
of Stockton Grade Separation |
12-08-01 |
June 8, 2011 |
7/12/2011 |
11/09/2011 |
|
|
|
|
|
|
|
|
Enterprise
Technology Infrastructure
Platform "ETIP" |
07-11-1 |
August 22,
2011 |
|
March, 2012 |
|
|
Emergency
Response Center Construction ("ERCC" Project) |
06-11-1/A |
August 3,
2011 |
|
March, 2012 |
|
Emergency
Response & Communications
("ER & C" Project) |
04-11-2 |
May 4, 2011 |
7/25/2011 |
11/22/2011 |
|
|
|
|
|
|
|
|
TWIC
Infrastructure & Communications Hub
("TI&CH" Project) |
04-11-1 |
May 5, 2011 |
7/12/2011 |
11/09/2011 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Click
on above “In Progress” project name to download the PDF of additional
bid award information – when available
|
|
|
|
Future
|
|
|
|
|
|
|
|
|
Project
Name:
|
Description:
|
| Highway 4 Offsite
Intersection Mitigation |
The project consists of
widening westbound State Route 4 to accommodate the installation of a
right turn lane from State Route 4 onto Fresno Avenue and the widening
of Fresno Avenue north of State Route 4 to accommodate dedicated right,
left, and through lanes |
| Navy Drive/HWY 4 Connection |
The port plans to make site
improvements to an existing warehousing facility including clearing and
grubbing, sawcutting, pavement, excavation, grading and compaction,
installation of base rock, asphault concrete pavement, ect. |
| Navy Bridge |
TBD |
|
|
|
|
[Top of Page]
This
site © Port of Stockton. All rights reserved.
|
|