Port of Stockton Projects 
As of January 6, 2012
 

Request for Qualifications

 

 

 

 

 

 

 

Project Name

Contract Number

Cost for

Documents / Drawings

Bid Date

Pre-Bid Conference

         

Professional Consulting Services   (pdf)
   Attachment 2, Federal Requirements (revised)   (pdf)
   Attachment 3, Current and Planned Project List   (pdf)
  
  
08-11-1 N/A January 18, 2012 N/A
         
 

Out for Bid

 

 

 

 

 

 

 

Project Name:

Contract Number

Cost for

Documents / Drawings

Bid Date

License

Requirements

Project
Estimate

Pre-Bid Conference

             

Secure Systems Software Project "S3"   (pdf)

   Request for Proposals   (pdf)

   Addendum No 1   (pdf)

   Addendum No 2   (pdf)
  
12-11-2 N/A February 1, 2012
3:00 pm
Certifications for products N/A  
             

West Complex Railroad Track Extension 1, 2  (pdf)

Documents available online for download:

1.   Project Manual Documents 00010 thru 00800 Attachment II   (6 MB pdf)
2.   Project Manual Documents 00821 thru 01770   (3 MB  pdf)
3.   Exhibit A - Site Location   (126 KB  pdf)
4.   Exhibit B - Drawings     (2 MB  pdf)
5.   Exhibit C - Tech. Specs for Construction of Industrial Tracks   (2 MB   pdf)

Bid Walk Attendees   (pdf)

Addenda No. 1    (pdf)
 
Top 3 Apparent Low Bidders    (pdf)
  

12-11-1 $0.00 January 11, 2012 Calif. "A"
Contractor's Lic.
N/A Mandatory
Dec. 21, 2011
2:00pm
             

West Complex Dock #14 Improvements 1, 2  (pdf)     Pre -Bid Conference Attendees   (pdf)

   Addendum No. 1    (pdf)
   Addendum No. 2    (pdf)

   Top 3 Apparent Low Bidders    (pdf)

  

11-11-2 $50.00 January 12, 2012 Calif. "A"
Contractor's Lic.
N/A Mandatory
Dec. 21, 2011
10:00am
             

West Complex Berth 14 Dock Fender Improvement 1, 2  (pdf)

   Project Manual   (pdf)  (9Mb)
   Bid Walk Attendees   (pdf)

   Addenda 1   (pdf)
   Addenda 2   (pdf)
   Addenda 3   (pdf)

 

01-12-1 $0.00 February 8, 2012 Calif. "A"
Contractor's Lic.
N/A Mandatory
Jan. 25, 2012
10:00am
             

Port of Stockton Marine Highway Barge Modification Project 1, 2  (pdf)

  

   Project Manual   (pdf)  

01-12-2 $0.00 February 29, 2012 Calif. "A"
Contractor's Lic.
N/A Mandatory
Feb. 13, 2012
Brusco Tug & Barge Maintenance Yard,
 1 Tugboat Alley, Cathlamet, WA
10:00am
             

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

In Progress

 
 

Contract Number

Bid Open

NTP

Completion Date

 
Container Crane Demolition 10-10-1 June 1, 2011 September 6, 2011 October 20, 2011  
           
Boiler Room Demolition  01-11-1 June 2, 2011 August 8, 2011 September 21, 2011  
           
BNSF/Port of Stockton Grade Separation  12-08-01 June 8, 2011 7/12/2011 11/09/2011  
           
Enterprise Technology Infrastructure
Platform "ETIP"
07-11-1 August 22, 2011   March, 2012  
Emergency Response Center Construction ("ERCC" Project) 06-11-1/A August 3, 2011   March, 2012  
Emergency Response & Communications
("ER & C" Project) 
04-11-2 May 4, 2011 7/25/2011 11/22/2011  
           
TWIC Infrastructure & Communications Hub
("TI&CH" Project)
04-11-1 May 5, 2011 7/12/2011 11/09/2011  
           

 

 

 

 

 

 

  • Click on above “In Progress” project name to download the PDF of additional bid award information – when available

 

Future

 

 

 

 

 

 

Project Name:

Description:

Highway 4 Offsite Intersection Mitigation The project consists of widening westbound State Route 4 to accommodate the installation of a right turn lane from State Route 4 onto Fresno Avenue and the widening of Fresno Avenue north of State Route 4 to accommodate dedicated right, left, and through lanes
Navy Drive/HWY 4 Connection The port plans to make site improvements to an existing warehousing facility including clearing and grubbing, sawcutting, pavement, excavation, grading and compaction, installation of base rock, asphault concrete pavement, ect.
Navy Bridge TBD
 

 

    

 